Tuesday, January 20, 2004

New Generator Arrives

The new standby generator was delivered on Monday afternoon. It was well packaged and looks to be in good shape. The guys are figuring out exactly where to locate it in the shop, planning the wiring runs, mounting the automatic transfer switch etc.

By Friday, we plan to have it all set up and the control wiring and the power cables run. An engineer will be over from Curacao to check everything out and do the initial startup and various proof of performance tests.